CPM Test & Evaluation
click to download T&E results for QM/FM
Test and Evaluation of Detector
The test and evolution of QM detector and FM detector were performed using a checkout system. The checkout communicates with the CPM by sending commands from the PC application and receiving telemetry data and user counts. As a part of clearing the environmental tests the command links and data links were verified. The counts without source under different LLD and count settings was observed and recorded as a basis of qualification. The detector was exposed to Radioactive sources like Ba133 (330 keV), Cs137 (660 keV), Eu152 (1112 keV & 1408 keV) for calibration.
Test Setup
The CPM Checkout System consists of following Items:
- Checkout PC with PCI based NI 32 bit HS DIO CARD (NI-6534)
- NI Connector Box and Cable
- Interface Cable between CPM Card and NI Connector Box
- Checkout Card
- Power Supply : +37V, 2A
- Power Supply : +5V, 1A
Test Sequence
Test | Description | |
QM | FM | |
Initial SRC |
Pre environmental test at standard room condition |
Pre environmental test at standard room condition |
EMI/EMC | 1. Radiated Susceptibility: RS03 |
1.Conducted Emission: CE03 2.Radiated Emission: RE02 3.Conducted Susceptibility: CS01, CS02, CS06 4.Radiated Susceptibility: RS03 |
Thermal Cycling |
-15ºC for 6 Hrs followed by 65ºC for 6Hrs. (Last ½ hour package is powered) |
-10ºC for 6 Hrs followed by 60ºC for 2Hrs and at 56ºC for 4hours |
Vibration test |
1. Sine vibration 2. Random Vibration |
1. Sine vibration 2. Random Vibration |
Shock Test | Performed | Not performed |
Thermo vacuum test |
1. at -15ºC and 65ºC 2. 5 short cycles – dwell time 2 hours 3. 1 long cycle – dwell time 24 hours 4. Transition time : 1 degree / min |
1. At -10ºC and 55ºC 2. 5 short cycles – dwell time 2 hours 3. 1 long cycle – dwell time 24 hours 4. Transition time : 1 degree / min |
Final SRC |
Post environmental tests at standard room condition |
Post environmental tests at standard room condition |