Test and Evaluation of CZTI

 

Test Setup

  • Power Supply: +37V, 2A
  • Power Supply: +5V, 1A
  • Power Supply: +5V, 1A
  • Function Generator
  • PC with NI Card 6534
  • NI Connector Box and Cable
  • ASTROSAT Check Out Card
  • Pulse Command Simulator

Test Sequence

T&E Sequence for QM and FM
Test Description
QM FM
Initial SRC Pre environmental test
at standard room condition
Pre environmental test
at standard room condition
EMI/EMC 1. Conducted Emission :CE03, CE07
2. Radiated Emission :RE02
3. Conducted Susceptibility :CS01, CS02, CS06
4. Radiated Susceptibility
1.Conducted Emission: CE03
2.Radiated Emission: RE02
3.Conducted Susceptibility: CS01,
CS02, CS06
4.Radiated Susceptibility: RS03
Thermal Cycling 1. -15°C for 6 Hrs followed by 35°C for 6Hrs 1. -15°C for 6 Hrs followed by 35°C for 6Hrs
Vibration test 1. Sine vibration
2. Random Vibration
(3 axes QM levels)
1. Sine vibration
2. Random Vibration
(3 axes Proto-FM levels)
Thermo vacuum test 1. at - 15ºC and 35ºC
2. 5 short cycles – dwell time 2 hours
3. 1 long cycle – dwell time 24 hours
1. At -15ºC and 35ºC
2. 5 short cycles – dwell time 2 hours
3. 1 long cycle – dwell time 24 hours
Final SRC Post environmental tests
at standard room condition
Post environmental tests
at standard room condition